Publish and release
Drafts, staging, production and rollback — and how an app already in users' hands picks up the change.
From the CLI
Section titled “From the CLI”-
Sign in and pick a project. Open the printed URL and choose Authorize CLI.
Terminal window useval login --console-url https://YOUR-CONSOLEuseval projects listuseval projects use PROJECT_IDuseval pull -
Edit, check, save a draft.
Terminal window useval analyzeuseval statususeval syncsyncsaves drafts. Nothing is served until it is published. -
Publish — staging first.
Terminal window useval deploy --component welcome --channel staginguseval deploy --component welcome --channel productionuseval releases list
Rollback and pinning
Section titled “Rollback and pinning”Rolling back is publishing the version that worked; it doesn’t take a newer version away from an app already holding it. An app can be pinned to a version in the console, so it keeps getting that version through later edits and rollbacks.
What updates without an app release
Section titled “What updates without an app release”Anything the installed SDK can already draw: layout, bindings, actions and theme. New native capabilities still need an SDK update.
Connect an app
Section titled “Connect an app”From your app’s directory, after signing in:
useval configureIt asks for the project and app type, then creates a useval/ folder with connection settings, an example and next steps. It doesn’t install SDKs or change your code.